QC Chart of Internal Quality Control (IQC)for G6PD Quantitative Test

QC Chart of Internal Quality Control (IQC)for G6PD Quantitative Test

Select LotNo:
Lab001

 Control NControl D
QC Control Lot No.AE0909NAE0909D
Duration of the AnalyzingMonth
(2019/04)
CUM
(2016/02/01~2020/01/31)
Month
(2019/04)
CUM
(2016/02/01~2020/01/31)
Runs (N)0000
Mean (U/gHb)----
SD----
CV (%)----
Target Value (U/gHb)14.414.45.85.8
Total Error (%)----
TEa (%)20202020
σ----
Bias (%) = [ (│Mean - Target│) / Target ] x 100%
TE:Total Error(%) = Bias (%) + 2 × CV (%)
σ (Sigma) = [TEa% - Bias (%)] / CV (%)

Month :    ;    Cumulative : from to
[TOP]



Control N and Control D SDI
QC Chart

Lot No.: AE0909N ; Duration : 2016-02-01 to 2020-01-31 ; Target : 14.4 ; SD : 0.4      ( ●) 
Lot No.: AE0909D ; Duration : 2016-02-01 to 2020-01-31 ; Target : 5.8 ; SD : 0.2      ( □)
Lab001
SDI Diagram of Control N & Control D

Month :    ;    Cumulative : from to
[TOP]



Control N SDI QC Chart

Lot No.: AE0909N ; Duration : 2016-02-01 to 2020-01-31 ; Target : 14.4 ; SD : 0.4
Lab001
SDI Diagram of Control N

Month :    ;    Cumulative : from to
[TOP]



Control D SDI QC Chart

Lot No.: AE0909D ; Duration : 2016-02-01 to 2020-01-31 ; Target : 5.8 ; SD : 0.2
Lab001
SDI Diagram of Control D

Month :    ;    Cumulative : from to
[TOP]